Abu noor

Forum Replies Created

Viewing 8 reply threads
  • Author
    Posts
    • #1461
      Abu noor
      Moderator

      Thanks Mr.Naser

    • #1454
      Abu noor
      Moderator

      Thanks Mr.Nasser
      For fast response

    • #1449
      Abu noor
      Moderator

      Thanks Mr.Nasir
      Once flushing is completed through system we can stop Fractionator pump which is used for internal circulation?
      Only we will keep long loop circulation if not why?

    • #1427
      Abu noor
      Moderator

      As we discussed earlier here attached sketch for heaters firing control.

      Attachments:
      You must be logged in to view attached files.
    • #1351
      Abu noor
      Moderator

      Dear Mr.Nasser
      See the attachments for product stripper pump

    • #1334
      Abu noor
      Moderator

      Dear Mr. Nasir
      Thanks a lot for your answer.
      We have three pumps one turbine driven and others motor dirven.There is no
      spillback is provided for this pump.Below is the product stripper level control with 8 passes.

      Attachments:
      You must be logged in to view attached files.
    • #1209
      Abu noor
      Moderator

      If SOR 373 and EOR 404 for reactor inlet and SOR 398 and EOR 409. How much WABT will be initially and when we can increase it based in what?

    • #1179
      Abu noor
      Moderator

      That’s great answer
      Thanks a lot

    • #1160
      Abu noor
      Moderator

      It’s mentioned in the SOP. The self-regulated main fuel gas valve 160-PCV-0165 is correctly set to the required pressure downstream in the line (0.1kg/cm2g) and 0.1 Kg/cm2g is too low that the Leak test can not be succeeded.

Viewing 8 reply threads