Following project documents are reburied for HAZOP Study and Hazop Team leader should thoroughly review the these before starting the HAZOP Study.
It should include Project Design Basis, Process Description, Process Flow Diagrams, Plot Plans, Engineering line drawings or P&IDs, Cause & Effect Diagrams,
Area Classification drawings, material safety data sheets, piping specifications etc.
Source http://www.petrorsik.com